Prato Selva Overview

Prato Selva

Projected Opening
Feb 16
Projected Closing
Mar 23
Lifts
2
Trails
7
Base
1,375m
Summit
1,775m
Vertical Drop
400m
Average Snowfall
9cm
Snowfall
9cm
Annual Snowfall
  • Dec1.3cm
  • Jan3cm
  • Feb0cm
  • Mar1.7cm
  • Apr0cm
Prato Selva
SkiGPT

Transportation

Important Dates

  • Projected opening date
    N.A.
  • Projected closing date
    N.A.
  • Average Snowfall
    9cm

Terrain

Intermediate Runs
45%
Advanced Runs
55%
Runs in Total
7
Skiable Terrain
11 km

Lifts

2
Quad Chairs
1
Surface Lifts
1