Dolný Smokovec - Pod lesom Overview

Dolný Smokovec - Pod lesom

Projected Opening
Jan 02
Projected Closing
Feb 21
Lifts
2
Trails
1
Base
874m
Summit
924m
Vertical Drop
50m
Average Snowfall
85cm
Snowfall
85cm
Annual Snowfall
  • Dec25cm
  • Jan60cm
  • Feb37cm
  • Mar6cm
Dolný Smokovec - Pod lesom
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Jan 02, 2027
  • Projected closing date
    Feb 21, 2027
  • Average Snowfall
    85cm

Terrain

Intermediate Runs
100%
Runs in Total
1
Longest Run
0.4 km
Skiable Terrain
0.4 km
Snow Making
0.4 km

Lifts

2
Surface Lifts
2