Čerťák pod Pradědem Overview

Čerťák pod Pradědem

Projected Opening
Feb 13
Projected Closing
Mar 07
Lifts
1
Trails
3
Base
684m
Summit
965m
Vertical Drop
195m
Average Snowfall
34cm
Snowfall
34cm
Annual Snowfall
  • Dec21cm
  • Jan26cm
  • Feb22cm
  • Mar0cm
Čerťák pod Pradědem
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Feb 13, 2027
  • Projected closing date
    Mar 07, 2027
  • Average Snowfall
    34cm

Terrain

Intermediate Runs
100%
Runs in Total
3
Longest Run
1.1 km
Skiable Terrain
2.5 km

Lifts

1
Quad Chairs
1