Krynica - Góra Parkowa Overview

Krynica - Góra Parkowa

Projected Opening
Dec 26
Projected Closing
Mar 14
Lifts
2
Trails
2
Base
705m
Summit
732m
Vertical Drop
27m
Average Snowfall
51cm
Snowfall
51cm
Annual Snowfall
  • Dec7cm
  • Jan34cm
  • Feb17cm
  • Mar4cm
Krynica - Góra Parkowa
Funicular Góra Parkowa is located in Krynica Zdrój. Funicular was built in 1937. At the top of the mountain is viewpoint where you can admire surrounding countryside. On top of the mountain is ski lift suitable for children.
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 14, 2027
  • Average Snowfall
    51cm

Terrain

Intermediate Runs
100%
Runs in Total
2
Longest Run
0.1 km
Skiable Terrain
0.2 km

Lifts

2
Gondolas & Trams
1
Surface Lifts
1