Wiesensteig Overview

Wiesensteig

Projected Opening
Dec 26
Projected Closing
Mar 07
Lifts
3
Trails
5
Base
605m
Summit
761m
Vertical Drop
156m
Average Snowfall
35cm
Snowfall
35cm
Annual Snowfall
  • Jan23cm
  • Feb6cm
  • Mar8cm
Wiesensteig
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 07, 2027
  • Average Snowfall
    35cm

Terrain

Intermediate Runs
52%
Advanced Runs
27%
Expert Runs
21%
Runs in Total
5
Longest Run
1.3 km
Skiable Terrain
4.8 km

Lifts

3
Surface Lifts
3