Steinberg Skilift Overview

Steinberg Skilift

Projected Opening
Dec 26
Projected Closing
Mar 07
Lifts
2
Trails
1
Base
790m
Summit
950m
Vertical Drop
160m
Average Snowfall
35cm
Snowfall
35cm
Annual Snowfall
  • Dec38cm
  • Jan25cm
  • Feb9cm
  • Mar0cm
Steinberg Skilift
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 07, 2027
  • Average Snowfall
    35cm

Terrain

Intermediate Runs
100%
Runs in Total
1
Longest Run
0.4 km
Skiable Terrain
0.4 km
Night Skiing
0.4 km

Lifts

2
Surface Lifts
2