Riedlberg Overview

Riedlberg

Projected Opening
Dec 26
Projected Closing
Mar 14
Lifts
2
Trails
3
Base
715m
Summit
850m
Vertical Drop
135m
Average Snowfall
32cm
Snowfall
32cm
Annual Snowfall
  • Dec5cm
  • Jan28cm
  • Feb10cm
  • Mar0cm
Riedlberg
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 14, 2027
  • Average Snowfall
    32cm

Terrain

Intermediate Runs
33%
Advanced Runs
34%
Runs in Total
3
Skiable Terrain
1.4 km

Lifts

2
Surface Lifts
2