Kubova Huť Overview

Kubova Huť

Projected Opening
Dec 26
Projected Closing
Mar 14
Lifts
3
Trails
5
Base
980m
Summit
1,100m
Vertical Drop
120m
Average Snowfall
42cm
Snowfall
42cm
Annual Snowfall
  • Dec13cm
  • Jan49cm
  • Feb13cm
  • Mar6cm
Kubova Huť
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 14, 2027
  • Average Snowfall
    42cm

Terrain

Intermediate Runs
45%
Advanced Runs
55%
Runs in Total
5
Longest Run
0.6 km
Skiable Terrain
1.8 km
Night Skiing
0.9 km
Snow Making
1.2 km

Lifts

3
Surface Lifts
3