Brotterode Overview

Brotterode

Projected Opening
Dec 26
Projected Closing
Mar 07
Lifts
2
Trails
2
Base
580m
Summit
916m
Vertical Drop
96m
Average Snowfall
79cm
Snowfall
79cm
Annual Snowfall
  • Dec20cm
  • Jan39cm
  • Feb23cm
  • Mar15cm
Brotterode
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 07, 2027
  • Years Open
    47
  • Average Snowfall
    79cm

Terrain

Intermediate Runs
100%
Runs in Total
2
Longest Run
0.7 km
Skiable Terrain
1.3 km

Lifts

2
Surface Lifts
2