Černý Důl Overview

Černý Důl

Projected Opening
Dec 26
Projected Closing
Mar 07
Lifts
7
Trails
11
Base
620m
Summit
865m
Vertical Drop
245m
Average Snowfall
80cm
Snowfall
80cm
Annual Snowfall
  • Dec15cm
  • Jan42cm
  • Feb25cm
  • Mar12cm
Černý Důl
SkiGPT

Transportation

Important Dates

  • Projected opening date
    Dec 26, 2026
  • Projected closing date
    Mar 07, 2027
  • Average Snowfall
    80cm

Terrain

Intermediate Runs
37%
Advanced Runs
63%
Runs in Total
11
Longest Run
1.4 km
Skiable Terrain
8.5 km
Snow Making
5.6 km

Lifts

7
High Speed Quads
1
Triple Chairs
1
Surface Lifts
5